
Photocopier and MFD deployment.
The fleet work Honor was built on. Every unit is run up and configured at Mortdale before it is allowed on a truck, delivered in install order, installed and set to the queue the site actually uses, and signed for against its serial.
- COVERAGE
- NSW · ACT
- GATE
- RUN-UP SIGNED
- BENCH
- 50 A4 · 25 A3 / WEEK
Fleet work, itemised.
A forty-device rollout across a dozen sites is a scheduling problem with an installation attached. Both halves are Honor's.
Multi-site rollout
Sites sequenced against install dates, one coordinator holding the whole run, and a register that says where every unit is at any point in it.
Run-up before despatch
Powered on, firmware and OS loaded, configured, serial verified and test printed at the Mortdale bench. Nothing leaves the dock until that is signed.
Delivered in install order
Staged on pallets by site and loaded so units come off the truck in the order the crew needs them. A floor is done in one pass rather than by chasing pallets around a building.
Installed and configured on site
Monitoring software and PaperCut configured on site where required, the serial checked against your asset register, and the device connected to the required print queue and tested before the crew leaves.
Swap-out and decommission
The outgoing fleet is decommissioned, logged and removed on the same visit, so a site is not running two fleets and paying for both.
Documented handover
A signed installation sheet per unit — name, role, date, serial — and a serial reconciliation against the register you gave us at the start.
Configured before it ships. Signed before we leave.
The same four steps and one gate the whole business runs on, at fleet scale.
Run-up at Mortdale
Power on, firmware and OS load, configuration, serial verification, test print. Signed at the bench.
Stage and sequence
Held with a pallet location, staged by site, and released against the install schedule rather than against a delivery route.
Install and configure
Monitoring software and PaperCut configured where required, serial checked against your register, print queue tested before we leave.
Sign off and reconcile
A signed sheet with the person who received it, and the run reconciled against the asset register at the end.

A record per unit, not per delivery.
On a fleet rollout the paperwork is what you are actually buying. A docket proves a truck arrived; these prove what is standing on each floor.
Run-up record
What was configured, verified and test printed at the bench, and who signed it off.
Signed installation sheet
Per unit: name, role and date of the person who took it on, against the serial.
Serial reconciliation
The installed fleet checked back against the asset register you supplied, so the register is current the day the rollout closes.
Decommission log
What came out, from where, and where it went.
What buyers ask us.
- Can you deploy a fleet across multiple NSW sites?
- Yes. Sites are sequenced against install dates with one coordinator across the whole run, and every unit carries a location from the moment it books into Mortdale until it is signed for on a floor.
- Do you work white-label for managed print providers?
- Yes. That is the primary channel. Crews go onto the floor under your name, with your paperwork, as an extension of your team.
- Do you configure print management, or just deliver?
- Configure, where it is in the job scope and the site's network access allows it. Monitoring software and PaperCut are set up on site, the serial is checked against your asset register, and the device is connected to the required print queue and tested. A device that is plugged in but not on the right queue is not an installed device.
- How many devices can you run up in a week?
- At the Mortdale bench, up to 50 A4 devices or 25 A3 devices a week. Wide-format equipment is usually run up and installed on site instead, so it does not consume bench capacity. Those are the ceilings on a full week — a mixed fleet sits between them.
- What happens to the old fleet?
- It is decommissioned, logged and removed on the same visit where the schedule allows. Data destruction is handled by a specialist provider rather than in-house — Honor's part is the custody record and the serial trail either side of it. A Certificate of Data Destruction is issued by Asset LifeCycles Management Group (ALM Group).
- Do you hold stock between sites?
- Yes. Pallet-level storage at Mortdale with a location and a days-in-storage count against every unit, which is what makes a staged rollout across a dozen sites possible without a device going missing between them.
The operations behind this work.
This is an equipment class, not a department. These are the parts of Honor that actually run it.
The rest of what Honor moves.
How can we help you?
Tell us the sites and the machine count. We will come back with a scope, a schedule and a price, not a brochure.
Pick the one closer to your job and we will tailor the response.
Hours / Mon–Fri, 7:30am – 4pm
After hours / Available by arrangement
